Engineering center About us 中文

Shanghai QiangJin Foundation Engineering Co., Ltd.

The foundation encyclopedia

──Aug 07 , 2022Construction process of large diameter rotary jet grouting pile

The construction method of large diameter rotary jet grouting pile is to use the diameter of150A mm bit drilled the guide hole and equipped with a jet monitor to turn on the high pressure jet when the designed toe level was reached. The spray treatment is initiated by breaking up the soil particles using high-pressure grouting, which is then sprayed and mixed for stirring under the rotation and upward motion of the nozzle. withDCMIn contrast, the coverage of mechanical drilling in the construction of large diameter rotary jet grouting pile is much smaller, and the construction drill of large diameter rotary jet grouting pile can meet the requirements of site height limit. As a result, the chance of encountering obstacles will be smaller, and the large diameter rotary jet grouting pile drill can drill holes in rock obstacles by pre-drilling.

Pile construction process of large diameter rotary jet grouting pile:

landDJMPile into pile process

Strong foundation,24Years of industry experience,143Patents,1000+Project experience, with science and technology to make the foundation stronger, adhering to the spirit of "great country craftsman", waterDCM, waterPVDAnd other innovative technologies, to provide contractors, owners, design institute with safe water foundation treatment engineering technical consultation, construction services and other comprehensive solutions. Welcome to call for free advice:400-100-2850.

BACK
PREV

Supply and acceptance inspection of steel support members for foundation pit support

NEXT

Construction principle of large diameter rotary jet grouting pile