Foundation pit supporting Construction units can be divided into Grade I, Grade II and Grade III professional contracting qualifications for foundation engineering. According to the Construction Law of the People's Republic of China and the qualification standards for construction enterprises formulated by relevant departments,2015years1month1The professional contracting qualification of foundation and foundation engineering in the new standard implemented on Sunday is changed to the professional contracting qualification of foundation and foundation engineering.
A,Foundation pit supporting Qualification standards for construction units
1Level 1 qualification standard
(1) Enterprise assets
Net worth2000More than ten thousand yuan.
(2(key personnel of the enterprise
①Class A registered constructor is no less than6People.
②The technical director has10At least 1 year working experience in engineering construction technology management, with senior title of engineering sequence or first-class registered construction engineer or registered geotechnical engineer; No less than intermediate professional title in structure, rock and soil, machinery, surveying and other majors15People, and professional complete.
③The construction site management personnel holding post certificate shall not be less than30People, and construction personnel, quality personnel, safety personnel, mechanical personnel, cost personnel and other complete.
④The number of qualified pile machine operators, electricians, welders and other technical workers shall not be less than30People.
(3) Enterprise engineering performance
nearly5Years have undertaken the following4In the class2Class engineering construction, project quality qualified.
①25Civil construction works or heights above the floor100Foundation and foundation works for structures larger than meters;
②The treatment depth of rigid pile composite foundation exceeds18Meters or more in depth8Other ground treatment works;
③A single pile bears the design load3000Thousands of cattle above the pile foundation project;
④Excavation depth exceeding12Meters of foundation pit enclosure project.
2Secondary qualification standards
(1) Enterprise assets
Net worth1000More than ten thousand yuan.
(2(key personnel of the enterprise
①Registered constructor no less than6People.
②The technical director has8At least 1 year working experience in engineering construction technology management, with senior title of engineering sequence or first-class registered construction engineer or registered geotechnical engineer; Structure, geotechnical, mechanical and other professional title of intermediate or above no less than10People, and professional complete.
③The construction site management personnel holding post certificate shall not be less than20People, and construction personnel, quality personnel, safety personnel, mechanical personnel, cost personnel and other complete.
④The number of qualified pile machine operators, electricians, welders and other technical workers shall not be less than20People.
(3) Enterprise engineering performance
nearly5Years have undertaken the following4In the class2Class engineering construction, project quality qualified.
①12Civil construction works or heights above the floor50Foundation and foundation works for structures larger than meters;
②The treatment depth of rigid pile composite foundation exceeds12Meters or more in depth6Other ground treatment works;
③A single pile bears the design load2000Thousands of cattle above the pile foundation project;
④Excavation depth exceeding9Meters of foundation pit supporting engineering.
3Third level qualification standard
(1) Enterprise assets
Net worth400More than ten thousand yuan.
(2(key personnel of the enterprise
①Registered constructor no less than3People.
②The technical director has5At least 1 year working experience in engineering construction technology management, and have intermediate title or above in engineering sequence or registered construction engineer or registered geotechnical engineer; Structure, geotechnical, mechanical and other professional title of intermediate or above no less than8People, and professional complete.
③The construction site management personnel holding post certificate shall not be less than10People, and construction personnel, quality personnel, safety personnel, mechanical personnel, cost personnel and other complete.
④The number of qualified pile machine operators, electricians, welders and other technical workers shall not be less than15People.
⑤The technical person in charge (or registered builder) has completed the project performance required by the standard of qualification level 2 or above in this category at least2Items.
2. Scope of projects that can be contracted by different qualifications
1Grade A qualification: can undertake the construction of all kinds of foundation projects.
2Grade 2 qualification
Can undertake the construction of the following projects:
①highly100Industrial and civil construction works below meters and their height120Foundation foundation works for structures under meters;
②Not exceeding depth24M rigid pile composite foundation treatment and depth does not exceed10Other ground treatment works;
③A single pile bears the design load5000Pile foundation works below thousand cattle;
④The excavation depth shall not exceed15Meters of foundation pit enclosure project.
3Level 3 qualification
Can undertake the construction of the following projects:
①highly50Industrial and civil construction works below meters and their height70Foundation foundation works for structures under meters;
②Not exceeding depth18M rigid pile composite foundation treatment or depth does not exceed8Other ground treatment works;
③A single pile bears the design load3000Pile foundation works below thousand cattle;
④The excavation depth shall not exceed12Meters of foundation pit enclosure project.
Foundation pit engineering requires the construction of foundation pit supporting units with corresponding qualifications, especially the deep foundation pit supporting units. Once the construction accident of deep foundation pit occurs, it is easy to cause group death and group injury, and the consequences are quite serious. In the construction of deep foundation pit engineering, supervision rules must be formulated to clarify the technical requirements of deep foundation pit engineering and the key points of inspection on the construction site.
Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment , slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-100-2850