Engineering center About us 中文

Shanghai QiangJin Foundation Engineering Co., Ltd.

The foundation encyclopedia

──Apr 10 , 2021Hazards of long exposure of foundation pit

The foundation pitLong time exposure, will cause to a certain depth of foundation pit excavation, subsoil swell up phenomena will be shown after the release of the pressure, rainfall or row to pit water leads to a pit soil softening, lower the palisade structure of passive resistance, so that the pit displacement of retaining structures and cause around the settlement and deformation of foundation pit, endanger the safety of the surrounding buildings and structures.      

The uplift of the pit bottom will cause the uplift of the supporting column, which will affect the force of the support, and then lead to the phenomena of tensile stress or bending instability of the support.

The foundation pitLong-term exposure will lead to excessive settlement and horizontal displacement around the foundation pit, resulting in cracking of surrounding buildings and damage of roads and pipelines.

Jiaxing Yaohan accompanies Foundation pit

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. Around" Excellent technology, reliable process", construction fast "technical requirements,Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise.Contact Number: 400-100-2850

BACK
PREV

Construction process of mud wall protection bored pile

NEXT

How to deal with foundation pit retaining crack