Engineering center About us 中文

Shanghai QiangJin Foundation Engineering Co., Ltd.

I at the scene

──Jan 27 , 2021Quality control: accurate measurement, strict control of errors

Jobs with high requirements for accuracy often use a variety of instruments and equipment.

In the field of foundation engineering, the theodolite and the level will appear on the site before the construction of each project begins. They will work with each other to accurately measure the pile body data throughout the construction process, keeping errors within permissible limits.

transit

Shanghai Strong Foundation Engineering Co., LTD The business covers foundation pit engineering, pile foundation engineering, land and water foundation treatment, slope treatment and other engineering fields. Focusing on the technical requirements of "reliable process, equipment research and development, efficient construction", it is a solid enterprise that provides customers with comprehensive solutions such as land and water foundation engineering technical consultation and construction services.Contact Number: 400-100-2850

BACK
PREV

Site standard: Hefei Yijia project site held a pre-class meeting

NEXT

Quality management: construction methodically, the process timely acceptance