──Jan 05 , 2022Introduction to construction technology of undisturbed earth taking and filling pile with full retaining cylinder

Introduction to construction technology of undisturbed earth taking and filling pile with full retaining cylinder
Process Introduction:
1The undamaged soil taking and filling pile with full retaining cylinder is drilled and cut into soil by double power drill with built-in spiral blades in full retaining cylinder to form pile diameter;
2Take out the soil in the protective tube without the original condition;
3After pouring or pressing concrete, the steel cage is inserted into the steel cage, and the reinforced concrete pile is formed after pulling out the protective cylinder.
Equipment features:
1And the power of the power head are respectively360kN.mand180kN.m , strong power;
2, the maximum lifting force180t;
3, the rig is equipped with fuselage self-balancing adjusting device and verticality controller;
4, the control room is equipped with pile machine drill pipe down and lift gear control device, can accurately control the drill pipe down and lift speed.
Applicable soil layer:
1And clay layer(Silt clay and silty soil)Silt and sand;
2, high water table and high confined water layer.
Technical Features:
1Hole forming without expanding diameter, saving concrete;
2Do not use mud wall protection, high pile quality;
3No mud production, green environmental protection;
4High pile forming speed;
5, the soil interference is small, the construction process has little influence on the pile and the surrounding environment, especially suitable for the project with high pile density;
6.No hole collapse, no neck shrinkage, high vertical precision, reliable quality.

Undisturbed filling pile with full retaining cylinder

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-1002850

BACK
PREV

Construction method of undisturbed earth - filling pile

NEXT

Construction requirements of undisturbed soil pouring concrete pile with full guard cylinder