Shanghai Special planking Vessel for Soft Foundation Reinforced by Underwater Plastic Drainage Plate (The seaPVDEngineering ship)Construction technology for the international initiative, intelligent, efficient and fast construction,1Construction in half minutes12The root30Meters long drainage board, domestic counterparts generally a construction2-4Root, and construction time is longer. Since the commencement of the project, it has been praised by the Hong Kong Airport Authority for many times. The operation of the equipment has been very successful.
Hong Kong International Airport Third Runway project3204The tender section has been successfully completed, and the special board boat for soft foundation reinforcement has been removed by removing the underwater plastic drainage plateIn addition, a deep cement mixer (DCMThe ship ),Deep cement mixer (DCMShip) integrates many high-end technologies, such as underground soil cutting and mixing, precise injection of cement grout, high and low grout nozzle exchange, environmental protection treatment system, intelligent control construction and so on. It is a major technical equipment with high technology and high added value, and it is a major offshore project(Irreplaceable high-tech equipment for projects such as sea reclamation, seaport construction, cross-sea bridge, maritime airport, Marine garbage yard), and intelligent core construction technologies such as pile frame mobile positioning system, cement slurry mixing and grouting system, and drilling and lifting pile system.
Hong Kong International Airport Third Runway project 3204A blockIt has broken the technological monopoly of Japan, South Korea, Europe and the United States and is in the leading position. In the future international large-scale projects, China will be seenUnderwater plastic drainage board reinforcement soft foundation special board boat andDeep cement mixerIn the figure.
Special planking ship with soft foundation reinforced by underwater plastic drainage board, Marine planking ship with strong foundation in Shanghai, ship positioning system,Power system, winch system,PVDThe multi-system combination of board insertion system and construction automation control system ensures the construction. It is a board insertion ship with the largest number of simultaneous board insertion, the deepest board insertion depth and the fastest board insertion speed in the world. Can beequipment8~12Pile set frame construction at the same time.
Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and water Foundation treatment , slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-100-2850