Engineering center About us 中文

Shanghai QiangJin Foundation Engineering Co., Ltd.

The foundation encyclopedia

──Dec 26 , 2021Prefabricated composite steel support construction emergency plan

Assembled steelsupportConstruction emergency plan:

1, the horizontal displacement of the Angle brace to the pit reaches or exceeds the alarm value

Emergency plan: in the right,gussetPrestressing end, installing jack.The prestress is applied in stages and the deformation is monitored until the deformation is stable.

2, the horizontal displacement of the fish belly beam to the pit reaches or exceeds the alarm value

Emergency plan:By putting the belly beam of the fishPrestressed strand and spareThe steel strand is carried outTension, againBy applying prestress, the deformation of the fish belly beam can be controlled and reducedThe effect of; The number of spare steel strands is not less than the total number of steel strands10%, should be tensioned one by one, tension for each130kNAt the same time, the deformation is monitored. When the deformation is stable, the prestress is stopped.

Assembled steel bracing

3, for,gussetThe horizontal displacement outside the pit reaches or exceeds the alarm value

Emergency plan: in the corresponding pair,gussetAt the applying end of prestress, install the jacking and pressing end, lower the amount of prestress, and extract the steel pad added during loading, whose thickness is determined by the value after monitoring the deformation stability, so as to control the outward deformation.

4, the axial stress of enclosing purlin of section steel reaches or exceeds the alarm value

Emergency plan: when the pressure of the enclosing purlin of the section is too large, add a longitudinal rib of channel steel in the compression section to increase the cross-section area of the enclosing purlin under compression, so as to reduce the compressive stress on the enclosing purlin; In the enclosing purlin of the steel section under pressure, fill the quick-setting and slightly expanded concrete,20Intensity produced in minutes; When the axial tensile stress around purlin of the beam is too large, add a steel plate at the beam joint and weld it with the beam at both ends of the joint to reduce the stress on the bolt.

5, alignment, Angle brace stress reaches or exceeds the alarm value

Emergency plan: when the monitoring shows that the stress is too large, the retaining wall at both ends of the opposite and Angle support should be piled with earth back pressure to reduce the pressure transmitted by the retaining wall, so as to reduce the supporting stress. The support should be added with more than one section steel to apportion the stress and reduce the supporting stress.

6, the connecting bolt is cut

Emergency plan: increase the number of connecting bolts at the cut place, or weld the connecting rod directly at the cut place.

7, local buckling of member joints

Emergency plan: increase the stiffening plate of the corresponding position member; Stiffening plate and member spot welding connection; Segmental welding.

Assembled steel bracing

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment , slope treatment and other engineering fields. Around" Excellent technology, reliable process ", construction fast "technical requirements, Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-1002850

BACK
PREV

Foundation pit supporting

NEXT

Quality control requirements for the original soil-filled concrete pile with full guard cylinder