Engineering center About us 中文

Shanghai QiangJin Foundation Engineering Co., Ltd.

Large equipment

Full hydraulic walking pile driving frame

The FULL HYDRAULIC walking pile driving frame is used for the suspension, lifting, displacement and steering of the power head, pile driving hammer or other equipment to realize the construction of different pile foundation projects.
Application: Widely used in subway, tunnel, city building and other kinds of pile foundation engineering, deep foundation pit support engineering, seepage dam engineering and other kinds of industrial and civil construction, is the common equipment in pile foundation construction.
The equipment parameters : Equipment height:21-60mMatch according to pile length.