Type of Project:Foundation pit engineering
Project Information:Maximum excavation depth26.5m; Construction of the section30A (PX1~PX30);
Construction technology:SMWThe method of pileΦ850mmInsert stirring pile700*300HSteel.
Start time:2009years4month
Project Introduction:Shanghai MILITARY INDUSTRIAL ROAD CROSS-RIVER TUNNEL IS LOCATED IN Shanghai PUDONG MILITARY INDUSTRIAL ROAD, WHICH IS ONE OF THE TWO IMPORTANT CROSS-RIVER PROJECTS IN THE construction OF THE CENTRAL RING Road. It is an important node connecting Pudong and Puxi in the southeast of the Central Ring Road.The construction line of the military industrial Road tunnel is long, and the main line is divided into30The construction section, the import and export and the central ring lineA1.1The elevation frame into the mouth of the phase, the end and the ring lineA1.1Standard connection, maximum excavation depth26.5m.
Shanghai Qiangqiang Foundation Engineering Co., Ltd. has completed more than 1,000 projects in the fields of housing construction, underground space, subway, railway, highway, bridge, tunnel, airport, sea reclamation, and so on. Hundreds of projects it has participated in have won the "Luban Award of China Construction Engineering" or the "Magnolia Award of Shanghai Construction Engineering".Contact Number: 400-100-2850