Some of the structural requirements of soil nailwall, mostly in the actual project experience summary, generally have the following provisions:
Details >Shanghai Qiangqiang Foundation Engineering Co., LTD., a wholly-owned subsidiary of SinoCHEM Rock & Soil, was established in 1998 with a registered capital of 200 million yuan. The qualification level is Grade I for professional contracting of foundation, Grade A for Structural design, Grade B for geotechnical design, Grade III for steel structure construction, Qualification for construction labor service, and qualification for foreign contracting projects. The business covers land and sea foundation treatment, foundation pit engineering, pile foundation engineering, slope treatment and other engineering fields.
Details >