Colombo Port City Development Project is located in the south of the south near the South Port of Colombo, capital of Sri Lanka. It is bounded by the South Port breakwater to the north, the Galle Valley to the south, and the coastline to the east. < br/> On March 29, 2018, the project was named by Forbes magazine as one of the "Five New Cities that will influence the future".
Details >Ningbo-taizhou-wenzhou Railway is located in the south of Linhai Station, Linhai City, Zhejiang Province, China. It is a national grade ⅰ railway connecting Ningbo, Taizhou and Wenzhou. This project is a key project of railway modernization in Zhejiang Province. < br/> The railway line from Ningbo station to Ouhai station, the length of 282.39 km, the design speed of 250 km, 200 km operation speed.
Details >The National Food Safety (Hengqin) Innovation Project covers a total area of 86,000 square meters and a total construction area of 238,700 square meters. The excavation depth of the foundation pit is 10.0 meters and the direct vacuum preloading FDP without sand is adopted.
Details >As an international aviation hub in the Asia-Pacific region, Hong Kong International Airport (HKIA), facing the increasing volume of aircraft take-off and landing, has decided to build its third runway in order to improve the carrying capacity to meet the above demand. In order to protect the environment, the Airport Authority of Hong Kong has adopted environmental protection methods such as deep cement mixing to expand the land.
Details >The project is located in Oubei Town, Yongjia County, Wenzhou City. It is a "three-dimensional city" project invested by Wantong Real Estate Co., LTD., New Hope Group Co., LTD.
Details >This project is located in wenzhou city binhai new city core zone, north from sea avenue, south to binhai ten six-way Yu Tianrui avenue, west, east check jin-hai yu, six projects including coastal 13 road, binhai eight-way, sea, road, sea, five four, a total of four municipal road and bridge, for the design, procurement and construction (EPC) turnkey project. The present situation of the site is formed by the reclamation of the tidal flats. The soil is basically silt about 23~30m below the surface, and silty clay about 30~75m below the surface.
Details >Dynamic compaction foundation treatment: Guangdong Jinshenglan Metallurgy Technology Co., LTD. Short process Excellent special steel project
Details >Click to see more cases of Shanghai Strong land foundation treatment
Details >Dynamic compaction foundation treatment: Heyuan Derun Iron and Steel Co., LTD. Annual output of 6 million tons short process excellent special steel project