The foundation encyclopedia

Strong foundation explains the advantages of FDP for fast soft foundation treatment
18 Dec

Strong foundation explains the advantages of FDP for fast soft foundation treatment

FDPRapid soft foundation treatment technology can obviously reduce the adverse effect of well resistance and smear effect on drainage consolidation, and reduce the blockage of drainage channel,It can eliminate the blind area of the traditional vacuum preloading drainage channel, avoid the dependence on sand resources in the traditional technology, and finally achieve the purpose of reducing the cost and shortening the construction period.

Details >
Steps for stability assurance of steel support in foundation pit support
13 Aug

Steps for stability assurance of steel support in foundation pit support

The foundation pit excavation should strictly abide by the principle of "layered excavation". The steel support of foundation pit should be set up in close coordination with the earth excavation, and the central excavation method should be adopted to excavate the earth near the steel support in order to prevent mechanical collision and support. The earthwork near the slope protection pile shall be excavated with manual assistance of small machines and tools. Mechanical excavation of collision steel support and bored cast-in-place piles shall be strictly prohibited. After the earthwork is excavated to the designed elevation, steel support shall be erected in time and prestressed shall be applied to reduce the exposure time without support.

Details >
Precautions for high strength bolt connection of steel support in foundation pit support
11 Aug

Precautions for high strength bolt connection of steel support in foundation pit support

High strength bolts should not be used as temporary bolts for installation of steel bracing in foundation pit. This is easy to cause the hole is not straight, or forced on the hole, so that the connecting plate fits, the screw thread damage of the bolt, the torque coefficient changes, the bolt shaft force is uneven, or the connecting plate produces internal stress. The friction surface should not be treated carelessly or the high-strength bolts should be installed without treatment. In this way, there will be a sandwich between the friction surface and the friction surface will not be properly protected.

Details >
Supply and acceptance inspection of steel support members for foundation pit support
09 Aug

Supply and acceptance inspection of steel support members for foundation pit support

The hoisting of steel supporting components for foundation pit supporting is carried out according to the pre-made installation flow sequence. The numbered components transported to the designated location on the site shall enter the site at least one day in advance to meet the requirements of the hoisting schedule. The entering components shall be reasonably distributed according to the design scheme and the hoisting area.

Details >
Construction process of large diameter rotary jet grouting pile
07 Aug

Construction process of large diameter rotary jet grouting pile

Large diameter rotary jet piles are constructed by drilling a guide hole with a 150 mm diameter drill bit with a jet monitor that turns on a high pressure jet when the designed toe level is reached. The spray treatment is initiated by breaking up the soil particles using high-pressure grouting, which is then sprayed and mixed for stirring under the rotation and upward motion of the nozzle.

Details >
Construction principle of large diameter rotary jet grouting pile
05 Aug

Construction principle of large diameter rotary jet grouting pile

The construction of large diameter rotary jet grouting pile is proposed to adopt double pipe jet grouting, which is composed of air and slurry in the grouting process. The enveloped air is used to enhance the progressive cavity widening in the soil, allowing the jet to penetrate further, forming a larger diameter than the single-tube system. In addition, it blows out the cutting mud to prevent the drilling annulus from plugging and thus preventing the ground uplift.

Details >
Innovation point of large diameter rotary jet grouting pile on strong foundation
03 Aug

Innovation point of large diameter rotary jet grouting pile on strong foundation

Large diameter rotary jet grouting pile has been applied in the land foundation treatment of the Third runway project of Hong Kong Airport. In order to meet the requirements and improve the construction technology, Shanghai Strong Foundation has carried out the following innovations on the construction technology of large diameter rotary jet grouting pile: 1. 2. Construction intelligent management system; 3. Large pile diameter

Details >
Method of moving and anchoring a ship for plastic water drainage plate engineering
01 Aug

Method of moving and anchoring a ship for plastic water drainage plate engineering

Strong foundation seaPVD(Drainage board) engineering ship construction technology for international innovation technology, intelligent, efficient and fast construction is dedicated to major projects at sea(High technology equipment for reclamation projects, seaports, cross-sea Bridges, maritime airports, Marine garbage dumps, etc.)1,PVDThe mooring system of the ship is not specified in the bidding document. Our company plans to anchor by conventional anchor cable connecting anchors. Anchoring work by anchoring......

Details >
Survey and quality control measures for engineering ships with plastic drainage plates on water
30 Jul

Survey and quality control measures for engineering ships with plastic drainage plates on water

I. Water plastic drainage board measurement and control1, the operation of the ship and the board machine are providedGPSThrough theGPSAccurate positioning of each pile,GPSThe principle is shown in figure3-1Shown below.2By installing underwater depth sounder, pressure sensor, tracking sensor and other instruments, the intelligent monitoring system can provide the construction operator with real-time parameters such as casing pressure, insertion depth, loop length and so on to ensure the depth of each pile. At the same time, it automatically records the serial number, depth and time of each pile......

Details >
Construction technology method of plastic water drainage board
28 Jul

Construction technology method of plastic water drainage board

Water plastic drainage board engineering ship integrates a number of high-end technologies such as ship positioning system, power system, winch system, PVD plate system and construction automation control system. It is a major technical equipment with high technology and high added value. It is a high-tech equipment specially used for major sea projects (reclamation projects, seaport construction, cross-sea Bridges, sea airports, sea garbage dumps, etc.). The plastic water drainage board is completed by the Marine PVD ship. The PVD ship has a whole-course intelligent monitoring system, which can monitor the construction data in real time. The specific operation method is as follows:

Details >

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment