Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information > The foundation encyclopedia > Strong foundation explains the advantages of FDP for fast soft foundation treatment
font: Big Middle Small

Strong foundation explains the advantages of FDP for fast soft foundation treatment

FDPRapid soft foundation treatment technology can obviously reduce the adverse effect of well resistance and smear effect on drainage consolidation, and reduce the blockage of drainage channel,It can eliminate the blind area of the traditional vacuum preloading drainage channel, avoid the dependence on sand resources in the traditional technology, and finally achieve the purpose of reducing the cost and shortening the construction period.

FDPRapid soft foundation treatment technologyIt can obviously reduce the adverse effect of well resistance and smear effect on drainage consolidation and reduce the blockage of drainage channel,It can eliminate the blind area of the traditional vacuum preloading drainage channel, avoid the dependence on sand resources in the traditional technology, and finally achieve the purpose of reducing the cost and shortening the construction period.

FDPConnection effect of vacuum preloaded vacuum filter tube and drainage plate

FDPInspection of the effect after technical treatment

Effect after foundation treatment

Wenzhou three rivers three-dimensional city

Effect after treatment

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. Around" Excellent technology, reliable process", construction fast "technical requirements,Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise.Contact Number: 400-100-2850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment