Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information

News and information

Advantages of retaining technology of deep foundation pit occluding pile
29 Jan

Advantages of retaining technology of deep foundation pit occluding pile

Deep foundation pit retaining pile is a kind of foundation pit retaining structure, and piles are interlocked and aligned with each other. In the construction process, it can be divided into hard bite and soft bite.

Details >
Section steel combination support, large working space foundation pit supporting technology.
27 Jan

Section steel combination support, large working space foundation pit supporting technology.

Section steel composite support is assembled on site by precast steel components. Compared with concrete support, it does not need to wait for concrete curing period, the construction period is shorter, and the demolition is convenient, and will not produce engineering waste, and the steel components are recycled again, and the cost is relatively lower.

Details >
Application of section steel composite support in deep foundation pit
25 Jan

Application of section steel composite support in deep foundation pit

Compared with the traditional concrete support, the steel composite brace-prestressed fish-belly foundation pit steel support is connected with high-strength bolts, which can be installed and disassembled quickly, and can significantly shorten the construction period. All components and materials are recycled, making them green and generally cheaper than traditional concrete supports.

Details >
Introduction to the retaining of deep foundation pit
23 Jan

Introduction to the retaining of deep foundation pit

Occluding pile is A new type of pile row structure, also known as AB pile, in which two different types of piles A and B occlude each other to form A vertical continuum with the functions of retaining soil and intercepting water. The purpose is to make the drained pile not only serve as a retaining member, but also play the role of water interception, so there is no need to set up another water interception curtain. Class A pile plays the role of water interception, and class B pile mainly plays the role of support and water interception. Class A pile is generally plain concrete pile, and class B pile is reinforced concrete pile.

Details >
Precautions for installation and disassembly of assembled steel composite support
21 Jan

Precautions for installation and disassembly of assembled steel composite support

The cross construction precautions involved in the installation and demolition of assembled steel composite support are as follows: 1. Earthwork excavation: (1) Earthwork excavation shall be carried out in accordance with the principle of "supporting before digging, layered symmetrical excavation, and overdigging is strictly prohibited". No earthwork excavation shall be carried out on the soil within the steel support area before the steel support is prestressed. (2) It is strictly prohibited to pile load on the steel structure support when digging. The steel structure support is the overall stress system, and the additional load on the support will lead to the instability of the steel support structure, which will affect the safety of the project.

Details >
Preparation for construction of prefabricated steel composite bracing
19 Jan

Preparation for construction of prefabricated steel composite bracing

The main basic materials and facilities in the construction stage of assembled steel composite support are: steel, supporting components and accessories, stacking site; Construction machinery and tools such as digging machine, crane, air compressor, electric welding machine, etc.; On-site office and living area. According to the different construction stages, dynamically optimize the layout of the site, according to the actual situation reasonable arrangement of the process, to ensure the smooth construction.

Details >
Prestressed steel composite bracing
17 Jan

Prestressed steel composite bracing

Prestressed fish-belly foundation pit steel support technology is a kind of composite steel support, is based on the principle of prestress, through a large number of engineering research and practical application, aiming at the traditional concrete inner support and steel support on the foundation pit deformation control ability of the lack of a deep foundation pit support structure system.

Details >
Construction procedure of high pressure rotary jet grouting pile
15 Jan

Construction procedure of high pressure rotary jet grouting pile

The following are the construction steps of high-pressure rotary jet grouting pile taking a project as an example: 1. Determination of pile position: According to the construction axis of the design drawing, measurement of pile position. 2, drilling into a hole: in order to prevent drilling deflection, drilling rig installation should be stable, the fuselage should be horizontal, the sky wheel, vertical axis, drilling center should be on a vertical line, the hole position deviation is not more than 50mm. Complete records should be recorded in the process of drilling. After the final hole, plug the hole with a woven bag to prevent sundries from falling into the hole.

Details >
Introduction to section steel combination support
13 Jan

Introduction to section steel combination support

Prefabricated composite steel support prestressed fish-belly foundation pit steel support technology is based on the principle of prestress, through a large number of engineering research and practical application, aiming at the shortage of traditional concrete inner support and steel support, a new type of deep foundation pit inner support structure system is developed.

Details >
Prestressed fish belly beam prefabricated steel support components and supporting principle
11 Jan

Prestressed fish belly beam prefabricated steel support components and supporting principle

Prestressed fish belly beam prefabricated steel support is composed of vertical retaining wall, prestressed fish belly beam, prepressed jack, enclosing purlin, Angle brace (counter brace), beef leg, triangular connector, vertical column, plane displacement detection system, prestressed monitoring system, and construction force monitoring system.

Details >

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment