As a foundation pit enclosure structure, the construction technology of diaphragm wall is suitable for all kinds of complex construction environment and almost all kinds of geological conditions, but the construction difficulty is different. In some special environmental conditions, it may even be the only effective construction method available.
Details >Shanghai strong ground water PVD engineering ship can be in the coastal waters, coastal sea towage, as coastal ports, breakwater, revetment, reclaiming land from seawaters in artificial island, the important construction methods for dealing with the basis of containing underground obstacles, or with a hard soil layer of silt, silt soil, such as filling soil saturated cohesive and miscellaneous fill in the soft foundation processing.
Details >In the construction process of foundation pit supporting engineering, the construction unit of foundation pit supporting engineering should consider the treatment of groundwater at the same time, that is, how to control groundwater, which is an important content in the design and construction of foundation pit engineering. Especially in sandy soil and silt soil, when the water is shallow and abundant, sometimes there is confined water layer in the lower aquifer, it becomes an important factor affecting the stability of foundation pit.
Details >Founded in April 1998 with a registered capital of 200 million yuan, Shanghai Qiangqiang Foundation Engineering Co., LTD. (Stock code: 002542) is located at No.289 Huixian Road, Jiading District, Shanghai.
Details >Marine PVD engineering ship is an offshore planking ship independently researched and developed by Strong Foundation. It is also the planking ship with the largest number of simultaneous planking, the deepest planking depth and the fastest planking speed in the world. 8~12 sets of pile frames are equipped for simultaneous construction, the maximum depth of laying is 43.3m (calculated from the deck), the ergon efficiency is 2.5min/ root, and the comprehensive ergon efficiency is 2500 / ship. Domestic counterparts generally construct 2-4 roots at a time, and the construction time is longer.
Details >What materials should the foundation pit supporting construction unit submit to the supervision unit:1,Enterprise qualification certificate, business license, safety production license, organization code certificate, tax registration certificate, etc. 2,Qualification certificate of project quality management system related personnel, including project manager construction engineer certificate, technical responsible engineer certificate, quality inspector certificate, construction worker certificate, safety officer certificate, material officer certificate, and special work worker certificate.
Details >The foundation pit supporting construction unit needs to pay attention to the problem in the construction, the foundation pit supporting project is temporary is the most challenging difficulty in the construction project, but also the key to reduce the project cost and ensure the quality of the project. The foundation pit supporting construction unit should pay attention to the following matters in the construction process:
Details >How to choose the type of foundation pit supporting structure: slope excavation, retaining type supporting structure, gravity type supporting structure, combined type supporting structure. How to select the appropriate type of foundation pit supporting structure? The principle of foundation pit support is safety, economy and ease of construction
Details >Water DCM (mixing pile) engineering ship can work in the coastal sea, offshore sea towage dispatch, suitable for coastal port wharf, breakwater, revetment, artificial island land reclamation foundation treatment construction. The construction principle is as follows: cement or cement-solidified material is added to the soft clay according to the relevant ratio, and at the same time, the construction method is forced to mix and mix, and the solid and stable soil is formed in the foundation by chemical curing, so as to achieve the purpose of strengthening the underwater soft soil as the foundation of hydraulic construction.
Details >The deep foundation pit supporting construction scheme must be determined according to the design requirements, foundation pit depth, site environment and contract requirements, and the chief engineer of the unit,   The construction can only be carried out after the chief supervision engineer approves and determines that the construction complies with relevant norms and laws and regulations.
Details >