Water PVD engineering vessel - offshore foundation treatment

Shanghai strong ground water PVD engineering ship can be in the coastal waters, coastal sea towage, as coastal ports, breakwater, revetment, reclaiming land from seawaters in artificial island, the important construction methods for dealing with the basis of containing underground obstacles, or with a hard soil layer of silt, silt soil, such as filling soil saturated cohesive and miscellaneous fill in the soft foundation processing.

Shanghai has a strong foundationThe waterPVD Engineering shipThe construction technology is the first in the world, which integrates ship positioning system, power system, winch system, PVD The multi-system combination of board insertion system and construction automation control system ensures the construction. It is a board insertion ship with the largest number of simultaneous board insertion, the deepest board insertion depth and the fastest board insertion speed in the world. Can be equipped with8~12Pile set and frame construction at the same time, intelligent, efficient and fast construction,1Construction in half minutes 12The root30Meter long drainage plate.

The waterPVDEngineering ship

The waterPVDEngineering shipCan in the coastal waters, coastal sea towage, as coastal ports, breakwater, revetment, reclaiming land from seawaters in artificial island, the important construction methods for dealing with the basis of containing underground obstacles, or with a hard soil layer of silt, silt soil, such as filling soil saturated cohesive and miscellaneous fill in the soft foundation processing. Insert the plastic drainage board into the soft soil foundation, under the action of the upper load, the void water in the soft soil foundation is discharged by the plastic drainage board, or the formation of land through the upper matting sand cushion or horizontal plastic drainage pipe, to accelerate the consolidation of the soft foundation. When the soil layer is hard or underground obstacles are encountered, the vibration hammer can be opened to speed up the insertion speed or remove the underground obstacles.

The waterPVD

Shanghai has a strong foundationThe waterPVDEngineering ship Offshore foundation treatment projects remove waterPVD A deep cement mixer is also used outside the project ship(DCM Vessel), deep cement mixer ( DCMShip) integrates many high-end technologies, such as underground soil cutting and mixing, precise injection of cement grout, high and low grout nozzle exchange, environmental protection treatment system, intelligent control construction and so on. It is a major technical equipment with high technology and high added value, and it is a major offshore project ( Irreplaceable high-tech equipment for projects such as sea reclamation, seaport construction, cross-sea bridge, maritime airport, Marine garbage yard), and intelligent core construction technologies such as pile frame mobile positioning system, cement slurry mixing and grouting system, and drilling and lifting pile system.

The waterPVD

The independent and advanced underwater foundation treatment project ships have broken the technological monopoly of Japan, Korea and Europe and the United States and are in a leading position. In the future international large-scale projects, we will see the figure of plastic drainage board reinforcement soft foundation board and deep cement mixing ship.

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-1002850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment