Introduction of six-axis stirring pile

Six axial mixing pile is our in uniaxial and biaxial and triaxial existing mixing pile on the basis of the development of a new type of cement-soil pile, inherited the principles of the biaxial mixing pile and displacement of soil, water cement ratio is small, low cost, less advantages, overcomes the biaxial and triaxial mixing pile work efficiency is low, the low degree of automation, the labor intensity of workers, poor mechanical safety defects.

Six shaft stirring pileIs our in uniaxial and biaxial and triaxial existing mixing pile on the basis of the development of a new type of cement-soil pile, inherited the principles of the biaxial mixing pile and displacement of soil, water cement ratio is small, low cost, less advantage, overcome the biaxial and triaxial mixing pile work efficiency is low, the low degree of automation, the labor intensity of workers, poor mechanical safety defects.

Six shaft stirring pileThe machine shall meet the following requirements:

(1(The rack system shall have the function of horizontal deviation and perpendicularity adjustment;

(2(It shall be equipped with depth and curing agent flow monitoring device and machine and tool working status display function;

(3(The power system shall be equipped with automatic shutdown function in case of abnormal conditions.

The slurry preparation and injection device on site shall meet the following requirements:

(1) The slurry preparation capacity should be calculated by pile per day2Times;

(2) The motor of the grouting pump should adopt frequency conversion adjusting device, and the rated working pressure of the grouting pump should not be less than1.5MPa.

Construction process flow

Six shaft stirring pile

Picture of equipment:

Six axis cement-soil mixing pile

Project Case:

Oasis Yabinley three

Oasis Yabinley three

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. Around" Excellent technology, reliable process", construction fast "technical requirements,Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise.Contact Number: 400-100-2850 

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment