Project Introduction: The project is located in the core area of Binhai New City, Wenzhou City, starting from Tonghai Avenue in the north, Binhai 16 Road in the south, Tianrui Avenue in the west, Jinhai Road 6 in the east, including Binhai Road 13, Binhai Road 8, Jinhai Road 4, Jinhai Road 5 in total4Municipal roads and6A bridge for design, procurement, construction (EPC(General contracting project. The present situation of the site is reclaimed by tidal flats, below the surface23~30mIt's basically silt on the left and right,30~75mThe left and right are silty clays.
Soft ground treatment profile: Total road mileage approx6.2 km, soft base treatment area approx35wanm², the project cost is about1.6One hundred million yuanThe time limit for a project about9months;
Construction technology: vacuum combined heap preloading+Plastic drainage board, cement mixing pile, prestressed pipe pile, filling, etc.;
Commencement Date:2021years10Month;
Construction unit: Beijing Changdao Qiangqiang Business Unit
Aerial view of the project
Construction photo of plate planter
Photo of drainage board and pipe connection
Photos of vacuum film after field laying
Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment , slope treatment and other engineering fields. Around" Excellent technology, reliable process", construction fast "technical requirements, Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-1002850