Construction process of mud wall protection bored pile

Bored pile refers to the use of drilling machinery drilled out of the pile hole, and in the hole poured concrete (or first in the hole hanging steel cage) and into the pile.

Bored pileRefers to the use of drilling machinery to drill out the pile hole, and pour concrete in the hole (or first in the hole to hang the steel cage) and into the pile.

Mud walls to make holesBored pileThe construction process is as follows:

grading→Pile a pay-off→Excavation of slurry pool, slurry ditch→Liners buried→Rig positioning and hole position correction→Hole forming, mud circulation, remove waste slurry, mud slag→Clear the hole for the first time→Quality acceptance→Lower steel cage and steel conduit→Clear the hole a second time→Pour underwater concrete→pile

Current bored pile

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. Around" Excellent technology, reliable process", construction fast "technical requirements,Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise.Contact Number: 400-100-2850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment