Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information > The foundation encyclopedia > Strong Foundation -- Dual-wheel milling Constant Thickness Mixed soil-cement continuous Wall Technology (CSM Construction Method)
font: Big Middle Small

Strong Foundation -- Dual-wheel milling Constant Thickness Mixed soil-cement continuous Wall Technology (CSM Construction Method)

CSM construction method is Cutter  Soil  Mixing (milling) deep Mixing technology, the technology by double rotary cutting on the construction site of the original state soil, at the same time into cement slurry and gas formation thickness of cement soil under continuous wall, used for water stop curtain, retaining wall or formation improvement, with formation adaptability is strong, construction speed is fast, high quality features into a wall, Especially suitable for complex formation use.

Strong foundation has obtained dozens of innovative technologies in pile foundation engineering, foundation pit engineering, water foundation treatment, land foundation treatment, and has been authorized invention patents54Item, Utility model patent82Item, Appearance design7To promote industrial technological progress as the way of enterprise survival, more than 20 years, in each different period, with continuous innovation results to support the development of enterprises.

Process principle:

CSMMethod isCutter Soil Mixing(milling) deep mixing technology, the technology by double rotary cutting on the construction site of the original state soil, at the same time into cement slurry and gas formation thickness of cement soil under continuous wall, used for water stop curtain, retaining wall or formation improvement, with formation adaptability is strong, construction speed is quick, the quality of the wall is high, particularly suitable for complex formation.

Technical Advantages:

1, the equipment wall size, depth, grouting amount, perpendicularity and other parameters of high control precision, can ensure the quality of construction;

2No "cold seam" concept, can realize seamless connection, forming seamless wall;

3And the wall thickness is0.7m~1mThe width2.8m;

4Crawler or walking main engine chassis, hydraulic diesel drive system, available360Degree rotation, convenient for corner construction;

5, milling wheel torque up to7.5t.mCutting,20mpaA rock layer within;

6, milling rotation number up to0~50rpm;

7Pile length can be reached60Meters above.

Project Case:

Fuzhou Binhai New CityCBD

Fuzhou Binhai New CityCBD

Nanjing Binjiang Headquarters base

Nanjing Binjiang Headquarters base

China Railway Construction Lingang Building Project

China Railway Construction Lingang Building Project

Shanghai Strong Foundation Engineering Co., LTD. Business coversFoundation pit engineeringPile foundation engineering, land and water Foundation treatment, slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-100-2850 

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment