Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information > The foundation encyclopedia > Requirements for monitoring deformation of composite support of Shanghai strong section steel
font: Big Middle Small

Requirements for monitoring deformation of composite support of Shanghai strong section steel

Shanghai STRONG foundation STEEL composite support technology has the advantages of short construction period, low cost, large space and so on. It adopts prestressed fish belly beam structure, also called prestressed fish belly foundation pit steel support. At the same time, the construction quality is strictly controlled, the construction process is standardized, safety and quality first, and the deformation of foundation pit support is strictly monitored. The following is the deformation monitoring of a project:

Shanghai strong foundation typeSteel composite support technology has the advantages of short construction period, low cost and large space. Using prestressed fish belly beam structure, also known as prestressed fish bellytypeSteel support for foundation pit. At the same time, strictly control the construction quality and standardize the construction technologyIn order tosecurityandThe quality ofAs the number one, strictly monitor the deformation of foundation pit support. Foundation pit support monitoringIt mainly includes the following points :

Sectional steel brace

(1)The deformation monitoring of the internal support system of tool assembly is usually carried out simultaneously with the foundation pit monitoring, and the monitoring content includes the change of the axial force of the member.

(2) component axial force monitoring:inThe main stress points of the prefabricated steel support members are directly arranged with string reaction meters or strain gauges, and the deformation stresses are integrated through conduction cables to monitor the frequency normally1 2time/Oh, my God, under unusual circumstances3 time~ 6 time/Days.

(3) The professional analysis of monitoring results shall be timely notified to all parties, and the process shall be continuously monitored until the end of foundation pit excavation and the structural concrete reaches the predetermined strength. Control the alarm value in strict accordance with the design indicators.

Close-up of fish belly beam

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and water  Foundation treatment , slope treatment and other engineering fields. around  "Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number: 400-1002850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment