Type of Project:Water foundation treatment engineering
Project Information:Total project investment1415Million Hong Kong dollars;Reclamation stretched650Ha.The passenger terminal building1Building;slots57A;The airport runway3800m.
Construction technology:The waterDCM,The waterPVD;
Start time:2016years6month
Project Introduction:As an international aviation hub in the Asia-Pacific region, Hong Kong International Airport (HKIA), facing the increasing volume of aircraft takeoff and landing, adopts the international leading water foundation treatment technology -- water in order to reduce uneven settlement, avoid stability damage and protect the Marine environmentDCM(stirring pile) and above waterPVD(plastic drainage plate) technology.
Hong Kong International Airport Third Runway project
Water drainage plate construction vessel
Floating mixing pile construction vessel
Shanghai Qiangqiang Foundation Engineering Co., Ltd. has completed more than 1,000 projects in the fields of housing construction, underground space, subway, railway, highway, bridge, tunnel, airport, sea reclamation, and so on. Hundreds of projects it has participated in have won the "Luban Award of China Construction Engineering" or the "Magnolia Award of Shanghai Construction Engineering".Contact Number:400-100-2850