Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information > The foundation encyclopedia > Concrete preparation and technical quality requirements for construction of pressed-grouting pile
font: Big Middle Small

Concrete preparation and technical quality requirements for construction of pressed-grouting pile

Concrete preparation and technical quality requirements for press-poured pile construction: (1) Concrete preparation for construction: This project uses commercial concrete. The site quality member accepts the performance indicators and grading of concrete on the scene. (2) Technical quality requirements: A. The supply station must provide the Quality Certificate of Ready-mixed Concrete and the concrete grading list;


(1) Concrete preparation for construction:

This project uses commercial concrete. The site quality member accepts the performance indicators and grading of concrete on the scene.

(2) Technical quality requirements:

A.The supply station must provide "ready-mixed concrete quality Certificate" and concrete grading list;

B.The performance indicators of commercial concrete are as follows:

Coarse aggregate size:5~25mm

Taken down fall C:180mm~220mm

Initial setting time: not less than6hours

C.The concrete of the commodity entering the site should have good workability and fluidity, and the slump loss should be able to meet the perfusion requirements.

Undisturbed concrete cast-in-place pile

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment , slope treatment and other engineering fields. Around" Excellent technology, reliable process ", construction fast "technical requirements, Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-1002850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment