Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information > The foundation encyclopedia > The technology of undisturbed earth filling pile
font: Big Middle Small

The technology of undisturbed earth filling pile

Undisturbed soil-taking cast-in-place pile can be divided into full support cylinder cast-in-place pile and pressure cast-in-place pile. Undisturbed soil full protecting tube piles the craft adopts full steel liners built-in spiral blade cutting soil formation under the double power drill of pile diameter, remove soil liners in the original state at the same time, reinforcing cage under water or inserting reinforcing cage after pouring concrete, reinforced concrete pile is formed after pull out steel liners, especially suitable for greater influence on the compaction of soil. The technology of undisturbed earth - taking and press-poured concrete pile inherits the advantages of long auger - hole press-poured pile.

Undisturbed soil-taking cast-in-place pile can be divided into full support cylinder cast-in-place pile and pressure cast-in-place pile.

Undisturbed filling pile with full retaining cylinder

In this process, a double-power drill with spiral blades in the whole supporting cylinder is used to cut the soil to form the pile diameter. At the same time, the soil in the supporting cylinder is removed, and the reinforcing cage is inserted into the reinforcing cage after pouring or pressurizing the concrete. After pulling out the supporting cylinder, the reinforced concrete pile is formed, which is especially suitable for the soil layer with great influence of soil extrusion.

Process features:

1No mud, protect the environment;

2, no hole collapse, high vertical precision, reliable quality;

3, the soil disturbance is small, the construction process has little influence on the first construction pile and the surrounding environment, especially suitable for the project with high density of pile placement.

Undisturbed filling pile with full retaining cylinder

Undisturbed earth taking and pressurized concrete pile

The technology of undisturbed earth extraction and pressure grouting concrete pile inherits the advantages of long auger drilling pile. First, the special auger drilling tool is used to the design depth of the pile bottom to form the pile diameter, and then the hollow pipe of the drill tool is used to continuously pump concrete to the pile top at high pressure to form plain concrete pile. At the same time, the replacement soil is taken out by using the original state of the spiral blade. Then the whole steel cage is vibratively inserted to form reinforced concrete cast-in-place pile.

Process features:

1No mud discharge, protect the environment;

2, save a lot of water and electricity construction direct costs, and improve the construction efficiency;

3Reliable quality of driving pile;

4Reduce the project cost.

The scene pictures

Wuzhong wanda

Wuzhong Wanda Plaza

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. Around" Excellent technology, reliable process", construction fast "technical requirements,Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise.Contact Number:400-1002850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment