The company the door
The water PVD(plastic drainage board) engineering ship is equipped with 12 slotting machines
The water PVD(plastic drainage board) engineering ship is equipped with 8 slotting machines
Jiading base
The water PVD(plastic drainage board) engineering ship is equipped with 8 vibrating hammer plunger machines
Company office building and base
Equipment open-air stacking site
The floating DCM(mixing pile) engineering ship is equipped with 3 DCM drilling RIGS
The floating DCM(mixing pile) engineering ship is equipped with 2 DCM drilling RIGS
Open space for material stacking
Equipment and material warehouse
Cement slurry feeder
Hong Kong airport is the biggest challenges facing the third runway construction aspect, before the project starts, sea DCM (mixing pile), land DCM (mixing pile), PVD (drain) in the sea, land gravel pile foundation treatment technology such as are for Japan, South Korea, the monopoly of international advanced technology, before and after the tender, the foreign counterparts enterprises of our country executes strict technology blockade. For this reason, the strong foundation has carried on the thorough research. After more than two years of continuous fighting day and night, countless scientific research, testing and adjustment, we have overcome the difficulties of equipment manufacturing and construction technology of PVD (drainage board) engineering ship, DCM (mixing pile) engineering ship, onshore gravel pile machine, and onshore DCM pile machine, and successfully mastered the core technology.