Construction method of stress dispersed stiffened pile with recoverable anchor bars
The utility model relates to APS assembled retaining pile structure and construction method
The invention relates to a rigid composite prefabricated sheet pile enclosure structure
The invention relates to a prefabricated sheet pile implantation method
The invention relates to a method for installing prefabricated T-shaped sheet pile retaining structure for foundation pit
Locking device for prestressing prefabricated fish belly beam
Special-shaped sheet pile (T-shaped double belly)
Special-shaped sheet pile (prefabricated rectangular box)
Special-shaped sheet pile (prefabricated circular arc square hole sheet pile)
Special shaped pile (prefabricated empty T-shaped pile)
Super long steel cage lifting structure
An underground diaphragm wall containing a prefabricated structure
Hong Kong airport is the biggest challenges facing the third runway construction aspect, before the project starts, sea DCM (mixing pile), land DCM (mixing pile), PVD (drain) in the sea, land gravel pile foundation treatment technology such as are for Japan, South Korea, the monopoly of international advanced technology, before and after the tender, the foreign counterparts enterprises of our country executes strict technology blockade. For this reason, the strong foundation has carried on the thorough research. After more than two years of continuous fighting day and night, countless scientific research, testing and adjustment, we have overcome the difficulties of equipment manufacturing and construction technology of PVD (drainage board) engineering ship, DCM (mixing pile) engineering ship, onshore gravel pile machine, and onshore DCM pile machine, and successfully mastered the core technology.