Focus on land, water foundation engineering comprehensive service providers
400-100-2850
Integrity pragmatism QIANGJIN FOUNDATION
TRD method machine

TRDThe method of machine

TRDThe cutting box with chain and cutter head is inserted into the ground to the design depth. After cutting the soil vertically, the machine can directly push the transverse cutting into the groove. At the same time, the cement slurry is injected into the foundation, and the original soil is fully mixed and stirred to form the underground continuous wall with uniform quality, high continuity and high water stop.
Application: Widely used in clay, sand and other soil layers.
Maximum depth of cutting:60m, maximum cutting width:850mm.


keywords TRD method

Latest News

Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment