Survey points of foundation pit engineering

Compared with the investigation of buildings, the investigation of foundation pit engineering has its own characteristics. With the excavation of the soil inside and outside the foundation pit, there will be stratum movement. Therefore, there are specific requirements for the scope and depth of investigation and geotechnical index test items.

Foundation pit engineeringCompared with the investigation of buildings, the investigation of the foundation pit has its own characteristics. With the excavation of the soil within a certain range inside and outside the foundation pit, there will be stratum movement. Therefore, there are specific requirements for the scope and depth of investigation and geotechnical index test items.

1Foundation pit engineering investigation needs to find out the situation

(1) Rock and soil distribution and physical and mechanical properties in and around the foundation pit;

(2) Whether the rock and soil have undesirable properties such as expansibility, collapsibility, thixotropy, frost heaviness, and earthquake liquefaction;

(3) the distribution and occurrence, filling condition, roughness and their combination relationship of soft structural plane;

(4(whether there are karst caves, soil caves, civil air defense fortifications and other underground caves in the site and their distribution;

(5) The type, water level, water pressure, water volume, recharge, dynamic changes and permeability of groundwater in each layer;

(6) Considerable depth around the foundation pit1-2Type and importance of adjacent buildings, subways, roads and pipelines, underground and ground water storage and transmission facilities, and their leakage.

2,Foundation pit engineeringScope of investigation and exploration

The detailed survey of the building is mostly arranged along the contour of the building, resulting in the lack of foundation pit design and construction data. The survey and exploration scope of the foundation pit should be beyond the contour of the building, generally take the foundation pit around the equivalent of twice the depth of the foundation pit. When there are special circumstances, still need to expand the scope.

The spacing of exploration points should be determined according to the complexity of the foundation pit and engineering geology and hydrogeology conditions, which is generally10m~30m. When the horizontal direction of the stratum changes greatly or there are weak structural planes, exploration points should be added to find out the distribution.

The depth of exploration point should be determined according to the complexity of foundation pit, engineering geology and hydrogeology conditions, and should meet the requirements of design and calculation, generally not less than the depth of foundation pit2~3When encountering moderate weathering and breeze rock formation in this depth, the depth can be appropriately reduced according to the type of rock and support requirements.

3,Foundation pit engineeringExploration method and soil property index

The main method of exploration is drilling, supplemented when necessary by pit exploration and geophysical exploration. Standard penetration test should be carried out for sandy soil. Static penetration test or standard penetration test should be done for silt and clay. Cross plate shear test is suitable for soft soil. If necessary, side pressure test and foundation bed coefficient test can be performed.

Through laboratory tests, the physical and mechanical properties of soil, especially the shear strength index, permeability coefficient, compression modulus and springback modulus, were obtained. The method of shear test should be matched with the method of analysis and calculation, which can be triaxial test or direct shear test. The drainage conditions of the test are determined according to the design requirements, and the residual shear strength test and lateral pressure coefficient test are done when necessary.

4,Foundation pit engineeringGroundwater types and dynamics

It is necessary to control the movement of groundwater by means of dewatering or water stoppage during foundation pit construction. So. The hydrogeological conditions such as type, burial condition, recharge condition, hydraulic connection and permeability coefficient of each aquifer should be ascertained during the investigation. The hydrogeological parameters such as permeability coefficient, water storage coefficient and influence radius of aquifer should be determined by field pumping test. The possible influence of convection sand, soil flow and piping is evaluated.

5Evaluation of engineering geological conditions

In addition to meeting the general requirements, the contents of the survey report of foundation pit engineering should also be evaluated for the following items:

(1) the proposedThe type of supportAnd demonstrate the construction should pay attention to matters;

(2) Provide parameters and indicators required for foundation pit design:

(3) to evaluate the influence of groundwater on foundation pit engineering;

(4) To evaluate the influence of surrounding conditions on foundation pit engineering;

(5) To evaluate the possibility of forming flowing sand, flowing soil, piping and overall instability in the construction process and put forward preventive measures. For SOIL WITH EXPANSIBILITY, COLLAPSIBILITY, FROST HEAVING AND OTHER SPECIAL PROPERTIES, THE INFLUENCE OF THESE SPECIAL PROPERTIES ON FOUNDATION PIT ENGINEERING SHOULD BE DEMONSTRATED, AND corresponding MEASURES FOR design and construction SHOULD be PUT FORWARD.

Foundation pit engineering

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and water Foundation treatment , slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise.   Contact Number:400-100-2850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment