Jinshan New Town01-04The project is located in Shanyang Town, Jinshan District.
Intelligent piling technology is adopted in pile foundation engineering. Foundation pit engineering adopts the technologies of portal double row pile, bored pile retaining, cement-soil mixing pile gravity dam, three-axis mixing pile water stop, prestressed fish-belly steel support, reinforced concrete support and so on.
Type of Project:Comprehensive engineering (pile foundation+ Foundation pit engineering)
Project information:Total pit area7.45wan㎡;Total length of foundation pit enclosure 1360m;The pile number4762The root;Single pile length27-38m.
Starting time:2020years8Month.
Project Introduction:Jinshan New Town01-04The project is located in Shanyang Town, Jinshan District.
Construction technology:Pile foundation works adoptedIntelligent embedded pileTechnology;The foundation pit project adopts the gantry type double row pile,Bored pileRetaining soil, cement-soil mixing pile gravity dam, three-axis mixing pile sealing,Prestressed fish-belly steel bracing, reinforced concrete support technology.
Shanghai Qiangqiang Foundation Engineering Co., Ltd. has completed more than 1,000 projects in the fields of housing construction, underground space, subway, railway, highway, bridge, tunnel, airport, sea reclamation, and so on. Hundreds of projects it has participated in have won the "Luban Award of China Construction Engineering" or the "Magnolia Award of Shanghai Construction Engineering".Contact Number:400-100-2850