Project introduction: The project is located in the north of the South Ring Road and the east of the West Ring Road, High-tech Zone, Yancheng City, Jiangsu Province, with a total planned investment of about20100 million yuan, the total construction area of about22.5wan㎡, including office11.2wan㎡,Talents apartment3.3wan㎡And a certain scale of commercial support.
Foundation pit profile:pitDepth of9.85m.Area of about52533㎡.The length of the rice is approx1171m.
The construction technology: three-axis mixing pile (waterproof curtain,about5.5wanm³),SMWWorking type insert steel (Cement-soil mixing pile square volumeabout4.2wanm³Section about7500t), pressurized pile, stiffened pile (large diameter anchor cable), concrete support, slope protection, pipe well dewatering, etc.
The commencement date:2022years2month26day
Foundation pit retaining plan (stiffened piles are used in areas without support)
Site construction photos