In the Great Wall Construction Group Headquarters base project, triaxial soil-cement mixing pile is used as the stop-water curtain, and borehole grouting pile and two concrete supports are combined to ensure the stability of the foundation pit. The grouting technology is used to fill between the stop-water curtain and the grouting pile, and biaxial soil-cement mixing pile is used to reinforce the pit side.

Project Information:The perimeter of the foundation pit approx611m, excavation area1.8wan㎡, excavation depth10.6~10.8m, the earthwork of the foundation pit reaches20.22wanm³

Construction technology:Bored pile+Triaxial cement mixing pile+Two concrete supports

Project Introduction:This project is located in the new area of LingangPDC1-0401Unit: The site is close to Dishui Lake, with Huanhunan 1st Road to the north and Shuiyun South Road to the south, with a total construction area of about11Ten thousand square meters.

Foundation pit supporting

Construction difficulties:

1, The north side of the foundation pit is a municipal road, buried underground with electricity, natural gas, information and water pipelines, and the east and west sides are planned roads, which have high requirements for the displacement control of the foundation pit.

2, The soil quality of the project is mainly composed of clay, silt and sandy soil, and the shallow soil layer contains submersible and confined water, which has a certain impact on the foundation pit.

Construction scheme:

The project adopts triaxial soil-cement mixing pile as the stop-water curtain, and combines the bored grouting pile and two concrete supports to ensure the stability of the foundation pit. The grouting technology is used to fill between the stop-water curtain and the cast-in-place pile, and biaxial soil-cement mixing pile is used to reinforce the pit side.

The foundation pit displacement control effect of the project is excellent and has no impact on the surrounding environment and facilities. At present, it has entered the stage of demolition and bracing.

Foundation pit supporting

Foundation pit supporting

Foundation pit supporting

Foundation pit supporting

Foundation pit supporting

Shanghai Qiangqiang Foundation Engineering Co., Ltd. has completed more than 1,000 projects in the fields of housing construction, underground space, subway, railway, highway, bridge, tunnel, airport, sea reclamation, and so on. Hundreds of projects it has participated in have won the "Luban Award of China Construction Engineering" or the "Magnolia Award of Shanghai Construction Engineering". Contact Number: 400-100-2850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment