Focus on land, water foundation engineering comprehensive service providers
400-100-2850
强劲地基 品质工程 信誉至上
Home
> News > News and information > The foundation encyclopedia > Construction quality inspection of cement - soil mixing pile
font: Big Middle Small

Construction quality inspection of cement - soil mixing pile

Quality inspection of cement-soil mixing pile construction quality inspection before excavation of foundation pit should be carried out before pouring of retaining wall pressure roof, the content of inspection includes pile strength and pile number review.   The strength of pile body should be measured by making cement-soil test block or drilling core.

Construction quality inspection of cement - soil mixing pile

The quality inspection before excavation should be carried out before the casting of the roof, including the recheck of pile strength and pile number. The strength of pile body should be measured by making cement-soil test block or drilling core. Test block production70.7x70.7x70.7mm³ Cube test, each machine class spot check2 Each pile should not be less than2The sampling point should be above the bottom of the pit1mRange and above the bottom of the soft soil pile sampling. Make each sampling point 3 Block cement soil test block. And should be underwater maintenance and measurement28dThere is no side limit of age Compressive strength. The number of cores taken by drilling shall not be less than the total pile number0.5%And no less than 3Root, root3Points, each point3 The test block. Drilling core The strength of the sample obtained should be multiplied by 1.2~1.3After the completion of drilling and coring, timely grouting is used to close the coring pores.

Standard for quality inspection of cement - soil mixing pile for biaxial mixing pile

Cement-soil mixing pile construction

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment , slope treatment and other engineering fields. Around"Excellent technology, reliable process", construction fast "technical requirements, Is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Contact Number:400-1002850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment