> News > Projects under construction > SMW construction pile and stiffened pile: Project of XV Robot Research and Development Center
font: Big Middle Small

SMW construction pile and stiffened pile: Project of XV Robot Research and Development Center

The total construction area of the project is 282,000 square meters; The total perimeter of the foundation pit is 1400m; Large area excavation depth of foundation pit 10.05m. The construction technology adopts double row SWM construction pile and stiffened pile

Type of Project:Foundation pit engineering

Project Information:Total building area28.2wan㎡; Total perimeter of foundation pit1400m; Large area excavation depth of foundation pit10.05m.

Construction technology:Double rowSWMThe method of pile,Stiffening pile

Start time:2020years11month

Project Introduction:The project of Yancheng Xifu Robot R&D Center is located in the west of Xinyuan Road and the south of Juheng Road in Yannan High-tech Zone, Yancheng City, Jiangsu Province. Xifu River is on the side of nine canals and the west side, which are self-used office buildings and factories.

77676aa8d14e457f82acf07ca570fedc_104

ver=2

Shanghai Qiangqiang Foundation Engineering Co., Ltd. has completed more than 1,000 projects in the fields of housing construction, underground space, subway, railway, highway, bridge, tunnel, airport, sea reclamation, and so on. Hundreds of projects it has participated in have won the "Luban Award of China Construction Engineering" or the "Magnolia Award of Shanghai Construction Engineering".  Contact Number:400-100-2850

Keywords: SWM method

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment