The shift room construction project of Air China Shanghai Pudong Work Area is located in the southwest of the whole airline base, which is located in the Second Road of the base, Hebin West Road, Third Road of the base and the rectangular plot K9 enclosed by the Pudong base of China Eastern Airlines.
Details >The foundation pit area of the project is 45,600m ²; Excavation depth of foundation pit 6.1-15m; The contract amount exceeds 100 million yuan; Pile row + local concrete support; Use construction technology for bored pile, three-axis mixing pile, powder jet pile, high-pressure rotary jet pile, concrete support, etc.;
Details >The total construction area of the project is 282,000 square meters; The total perimeter of the foundation pit is 1400m; Large area excavation depth of foundation pit 10.05m. The construction technology adopts double row SWM construction pile and stiffened pile
Details >The area of the project38751㎡; Construction area of69150㎡; Building height23.55m; Foundation pit enclosure area30452㎡; Total perimeter of foundation pit847m. The foundation pit project adopts the construction scheme combining bored pile, steel support, three-axis cement mixing pile, bite pile, soil nail wall and other technologies.
Details >Click to see more cases of Shanghai Strong land foundation treatment
Details >Click to see more examples of Shanghai Strong Comprehensive Project
Details >Click to see more cases of Shanghai Strong Pile Foundation project
Details >Stiffening pile: Wenzhou Longwan Wanda Plaza
Details >Three-axis stirring pile: Wenzhou High-tech Culture Square
Details >Foundation pit Project: Affordable housing Phase I, Longwan District, Wenzhou
Details >