SMW construction method + prestressed fish-belly type foundation pit steel support: Air China Shanghai Pudong Work Area shift housing project
17 Dec

SMW construction method + prestressed fish-belly type foundation pit steel support: Air China Shanghai Pudong Work Area shift housing project

The shift room construction project of Air China Shanghai Pudong Work Area is located in the southwest of the whole airline base, which is located in the Second Road of the base, Hebin West Road, Third Road of the base and the rectangular plot K9 enclosed by the Pudong base of China Eastern Airlines.

Details >
The contract amount is over 100 million yuan, grouting pile, mixing pile, rotary jet grouting pile: Jindi Wuhan Lanting Dajing K3 Project
17 Dec

The contract amount is over 100 million yuan, grouting pile, mixing pile, rotary jet grouting pile: Jindi Wuhan Lanting Dajing K3 Project

The foundation pit area of the project is 45,600m ²; Excavation depth of foundation pit 6.1-15m; The contract amount exceeds 100 million yuan; Pile row + local concrete support; Use construction technology for bored pile, three-axis mixing pile, powder jet pile, high-pressure rotary jet pile, concrete support, etc.;

Details >
SMW construction pile and stiffened pile: Project of XV Robot Research and Development Center
09 Dec

SMW construction pile and stiffened pile: Project of XV Robot Research and Development Center

The total construction area of the project is 282,000 square meters; The total perimeter of the foundation pit is 1400m; Large area excavation depth of foundation pit 10.05m. The construction technology adopts double row SWM construction pile and stiffened pile

Details >
Steel support, cast-IN pile, MIXING pile: Deqing International Exhibition Center (Phase II) project
09 Dec

Steel support, cast-IN pile, MIXING pile: Deqing International Exhibition Center (Phase II) project

The area of the project38751㎡; Construction area of69150㎡; Building height23.55m; Foundation pit enclosure area30452㎡; Total perimeter of foundation pit847m. The foundation pit project adopts the construction scheme combining bored pile, steel support, three-axis cement mixing pile, bite pile, soil nail wall and other technologies.

Details >
More cases of land foundation treatment
28 Apr

More cases of land foundation treatment

Click to see more cases of Shanghai Strong land foundation treatment

Details >
More cases of integrated engineering
28 Apr

More cases of integrated engineering

Click to see more examples of Shanghai Strong Comprehensive Project

Details >
Pile foundation engineering more cases
28 Apr

Pile foundation engineering more cases

Click to see more cases of Shanghai Strong Pile Foundation project

Details >
Stiffening pile: Wenzhou Longwan Wanda Plaza
18 May

Stiffening pile: Wenzhou Longwan Wanda Plaza

Stiffening pile: Wenzhou Longwan Wanda Plaza

Details >
Three-axis stirring pile: Wenzhou High-tech Culture Square
18 May

Three-axis stirring pile: Wenzhou High-tech Culture Square

Three-axis stirring pile: Wenzhou High-tech Culture Square

Details >
Foundation pit Project: Affordable housing Phase I, Longwan District, Wenzhou
18 May

Foundation pit Project: Affordable housing Phase I, Longwan District, Wenzhou

Foundation pit Project: Affordable housing Phase I, Longwan District, Wenzhou

Details >

Contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment