The vibration-immersed tube rubble pile method is a method that uses the vibration-immersed tube to form holes, and adds hard particles to the tube, and forms the rubble pile after the pipe is pulled out and vibration-sealed to treat the foundation. The pile diameter can reach 1200mm, and the pile length can reach more than 40m. Vibration immersed tube gravel pile test pile construction
Details >The vibration-immersed tube scree pile method adopts the vibration-immersed tube to form holes, and adds hard particles to the tube, and forms the scree pile after pipe drawing and vibration compaction to treat the foundation. The pile diameter of Shanghai strong foundation large-diameter vibration-immersed tube scree pile can reach 1200mm, and the pile length can reach more than 40m.
Details >Considering the characteristics of the surrounding environment and the stress of the horizontal support system of this project, the principle of excavation of foundation pit supporting construction is as follows: 1. Before earthwork excavation of foundation pit supporting construction, detailed earthwork excavation construction organization design should be prepared. 2, foundation pit supporting construction earthwork excavation should strictly implement the principle of "stratification, segmentation, symmetry and balance".
Details >Quality assurance measures for biaxial mixing pile construction: 1. Hole setting out error is less than 50mm, pile vertical error is less than 1/100.
Details >1. Surveying and laying out according to the coordinate reference (control) point provided by the owner (or the general contractor), carry out the setting out positioning and engineering survey according to the design drawing, and make the permanent point and temporary point marks. The survey technology review list shall be completed after setting out and line, and the next procedure shall be carried out after the general contractor and supervision unit check and pass.
Details >Shanghai strong foundation strength composite pile construction drilling scheme: 1, cement soil mixing pile construction depth range, all the drill pipe using cross blade.
Details >1. The general survey control network submitted by the urban surveying and mapping department or unit cannot be directly used as the first level plane control network. The control network must be encrypted or auxiliary measures can be used.
Details >Large-diameter vibrating immersed tube crushed stone pile is a deep and large-diameter dense pile body composed of crushed stone formed by sinking the steel feed pipe into the design depth by using high-power vibrating hammer as the driving force, filling the gravel into the hopper and silo, and then pulling out the feed pipe through vibration. Compared with the traditional technology of gravel pile, Shanghai Qiangqiang has mature construction technology and experience, and has dozens of gravel pile construction equipment, which has been successfully used in many large-scale foundation treatment projects at home and abroad.
Details >The elevation of the steel cage and lattice column can be calculated by the elevation at the top of the mouth guard pipe. The design elevation of the pile top must be guaranteed when placed, and the allowable error is ±10mm. The lattice column and the steel cage must be welded firmly, and the vertical deviation is not more than 1/300.
Details >Concrete cast-in-place pile construction is an important part of construction, if its quality is not well controlled, it may occur hole collapse, diameter reduction, pile hole deflection and pile end can not meet the requirements of the designed bearing layer, but also directly affect the quality of the pile and cause the reduction of pile bearing capacity.
Details >