TRD construction technology advantages
29 Apr

TRD construction technology advantages

TRD method construction technique with traditional wall is different, is to meet the design depth with cutting chain and cutter cutting box into the underground, on the longitudinal cutting lateral push into the slot at the same time, to the inside foundation injected water mud stir to mix with the same foundation form in underground continuous wall with uniform thickness is a kind of construction technology.

Details >
Construction technology of pressure grouting pile
27 Apr

Construction technology of pressure grouting pile

Shanghai has a strong foundation undisturbed soil pressure pouring concrete pile technology, pressure filling pile technology has the following advantages: (1) the good quality of pile concrete from the tool center to the hole medium pressure, less material is close-grained, broken pile and necking phenomenon, the soil around the pile hole by compaction, not easy to happen the surface uplift, slumping hole and reducing adverse phenomenon, overall, good pore forming quality.

Details >
Installation and emplacement of pile machine before the construction of press-poured pile
23 Apr

Installation and emplacement of pile machine before the construction of press-poured pile

Before the construction of pressurized poured pile, the situation of pile foundation operation area should be determined to ensure the stable construction of pressurized poured pile. The following contents are the installation preparations of pile machine before the construction of pressurized poured pile in Shanghai strong foundation: (1) The foundation of the operation area should be treated before the pile machine is in place. The bearing capacity of the treated foundation is required to reach 160KN/m2. If not, the subgrade box should be used for reinforcement to ensure that the foundation does not suffer from uneven settlement.

Details >
Construction technology of pressure grouting pile
21 Apr

Construction technology of pressure grouting pile

1. Strong adaptability: The pile type is suitable for clay soil, silt soil, filled soil and other soil types, and can be used for pile formation under complex geological conditions such as reduced diameter soft soil, flowing sand layer, sand pebble layer and groundwater. 2, pile quality is good: due to the concrete from the center of the drill pipe into the hole, the concrete has the characteristics of dense, constant pile, no shrinkage neck, and can penetrate, compaction pile hole around the soil.

Details >
Control of perpendicularity of groove wall by CSM construction method
19 Apr

Control of perpendicularity of groove wall by CSM construction method

The quality of CSM construction is focused on the control of perpendicularity. In order to ensure the quality of slotting and effectively control the perpendicularity, the following measures are taken:

Details >
Stability control of CSM construction groove wall and corresponding measures
17 Apr

Stability control of CSM construction groove wall and corresponding measures

Groove wall stability is the most important task in diaphragm wall construction. According to the characteristics of the project, the following technical measures are formulated for the key points affecting groove wall stability.

Details >
Top drawing of joint box during CSM construction
15 Apr

Top drawing of joint box during CSM construction

Top pulling operation of joint box during CSM construction: joint box should have enough stiffness, and flow should be prevented during concrete pouring. Top pulling of lock pipe should be combined with concrete pouring, and concrete pouring record should be used as the control basis for top pulling lock pipe time.

Details >
Concrete preparation and technical quality requirements for construction of pressed-grouting pile
13 Apr

Concrete preparation and technical quality requirements for construction of pressed-grouting pile

Concrete preparation and technical quality requirements for press-poured pile construction: (1) Concrete preparation for construction: This project uses commercial concrete. The site quality member accepts the performance indicators and grading of concrete on the scene. (2) Technical quality requirements: A. The supply station must provide the Quality Certificate of Ready-mixed Concrete and the concrete grading list;

Details >
CSM construction of concrete
11 Apr

CSM construction of concrete

1. The gradation of concrete in the groove section of this project not only meets the requirements of structural strength, but also meets the requirements of underwater concrete construction, with good workability and fluidity. The slump of concrete shall be 180mm ~ 220mm.

Details >
CSM construction mud treatment work
09 Apr

CSM construction mud treatment work

1. Slurry storage: Semi-buried brick slurry pool is used for slurry storage. Set up mud pool and transfer pool according to the actual situation on site. The capacity of the slurry pool containing the slurry should be able to meet the slurry consumption during the trough construction.

Details >

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment