I. Flow chart of SMW construction method; Second, & have spent SMW construction method: 1, the way of section steel insertion, 2, SMW construction method of section steel material basic provisions; 3. SMW work method of inserting steel; Four, the steel pull out.
Details >First, the function of foundation pit engineering, second, the design requirements of foundation pit engineering
Details >The characteristics of foundation pit engineering: 1, foundation pit engineering is a comprehensive discipline in geotechnical engineering, 2, temporary and risky, 3, the regional difference of foundation pit engineering, 4, the environmental conditions around the foundation pit strict requirements
Details >Compared with the investigation of buildings, the investigation of foundation pit engineering has its own characteristics. With the excavation of the soil inside and outside the foundation pit, there will be stratum movement. Therefore, there are specific requirements for the scope and depth of investigation and geotechnical index test items.
Details >A, bolt construction points: 1, drilling, 2, set up reinforcement or steel strand bundle, 3, grouting, 4, prestress tension; Two, bolt monitoring:
Details >The CHARACTERISTICS OF THE REVERSE METHOD IN FOUNDATION PIT ENGINEERING ARE AS FOLLOWS: 1. The FORWARD METHOD AND THE REVERSE METHOD; 2. The FOUNDATION PIT SUPPORTING STRUCTURE AND THE UNDERGROUND MAIN STRUCT-INTEGRATION; 3. Shorten THE WHOLE CONSTRUCTION PERIOD; 4
Details >The construction of undisturbed soil taking concrete cast-in-place pile with full protective simplicity adopts dual-power drill with built-in spiral blades to drill down and cut the soil to form the pile diameter. At the same time, the undisturbed soil in the protective simplicity is removed, and the concrete is inserted into the steel cage after being pressed and the protective simplicity is removed to form reinforced concrete piles.
Details >In order TO ensure the smooth construction of foundation pit engineering, the construction scheme should be formulated according to the relevant provisions of the design specification of foundation pit support, and the corresponding safety protection measures should be taken.
Details >The main construction steps of SMW construction pile (cement soil mixing pile) are as follows: 1. Construction preparation; 2. Two, stirring pile construction; Three, insert H steel; 4. Pull out the H-beam
Details >Bored pile refers to the use of drilling machinery drilled out of the pile hole, and in the hole poured concrete (or first in the hole hanging steel cage) and into the pile.