This project is a large-scale home furnishing mall invested and constructed by Hefei IKEA Furniture Co., LTD. It is a local provincial and municipal key project in 2020. It is located at the intersection of Mengcheng North Road and Linquan Road, Luyang District, Hefei City. The surrounding environment is complex, with the subway station of Line 5 in the east, the subway station of Line 3 in the south, and the residential community and municipal pipeline culverts in the west.
Details >Pile foundation and foundation pit enclosure project of Ruyuyuan Project No.2, located in Rudong County, Nantong City, Jiangsu Province. The business form is residential, commercial street, office (villa), basement, kindergarten and public supporting facilities. On the west side of the project site, there are several cultural conservation buildings (shallow foundation) with poor structural integrity. The protection of cultural conservation buildings is the focus of pile construction of the project. To solve this problem, the project team made a detailed plan:
Details >The main soil layer of the project site is soft soil, which has the characteristics of low strength, large disturbance and high moisture content. According to the situation of the project site, the pile foundation engineering adopts our innovative patent technology -- intelligent pile planting technology.
Details >The shift room construction project of Air China Shanghai Pudong Work Area is located in the southwest of the whole airline base, which is located in the Second Road of the base, Hebin West Road, Third Road of the base and the rectangular plot K9 enclosed by the Pudong base of China Eastern Airlines.
Details >The foundation pit area of the project is 45,600m ²; Excavation depth of foundation pit 6.1-15m; The contract amount exceeds 100 million yuan; Pile row + local concrete support; Use construction technology for bored pile, three-axis mixing pile, powder jet pile, high-pressure rotary jet pile, concrete support, etc.;
Details >The total construction area of the project is 282,000 square meters; The total perimeter of the foundation pit is 1400m; Large area excavation depth of foundation pit 10.05m. The construction technology adopts double row SWM construction pile and stiffened pile
Details >The area of the project38751㎡; Construction area of69150㎡; Building height23.55m; Foundation pit enclosure area30452㎡; Total perimeter of foundation pit847m. The foundation pit project adopts the construction scheme combining bored pile, steel support, three-axis cement mixing pile, bite pile, soil nail wall and other technologies.