Deep cement mixer - Shanghai Strong Foundation Offshore DCM vessel

Deep cement mixer (DCM ship) integrates many high-end technologies, such as underwater soil cutting and mixing, precise injection of cement grout, exchange of high and low grout spout, environmental protection treatment system and intelligent control construction. Shanghai Strong Foundation has fully mastered the core technology of intelligent construction, such as mobile positioning system, leveling system, cement slurry mixing and grouting system, down-drilling and driller pile system, etc., breaking the monopoly of Japan and South Korea in this field, and filling the domestic gap.

Deep cement mixer (DCM) underwater cutting soil mixing, cement grout precision injection, high and low serum nozzle swaps, environmental protection treatment system, a number of high-end technology such as intelligent control construction in a body, a strong foundation in Shanghai now fully grasp the engineering ship mobile positioning system, leveling system, cement mixing and grouting system, drilling and extraction system of drilling pile system intelligent construction of core technology, Break the monopoly of Japan and South Korea in this field, and fill the domestic blank. strongDCMThe quality of our ships is much better than that of Japanese and Korean companies. The performance of the equipment fully meets the design requirements. It is the first private enterprise in China to own the project ship, and also the largest enterprise with the same type of project ship in China.

Deep cement mixer

Hong Kong Airport Third Runway projectLand reclamation agreement 650Hectare, cost approx560Million Hong Kong dollars (approx480100 million yuan), in order to protect the environment, the project uses deep cement mixing method and other no-dig methods to expand the land. Tenders for reclamation and foundation treatment are divided into6A bid.3026Cost of tender reclamation and foundation treatment approx130100 million Hong Kong dollars, including the cost29The foundation treatment project of HK $100 million was contracted by Shanghai Qiangqiang Foundation Engineering Co., LTD.

Hong Kong Airport Runway 3

In order to minimize the possibility of leakage of pollutants from the reclaimed land and affecting Marine life, the Hong Kong International Airport (HKIA) three-run project uses the seaDCMAnd the landDCMAnd the seaPVDGround treatment technology such as land gravel pile is the international advanced technology monopolized by Japan, Korea or Europe. Before and after bidding, Japanese and Korean enterprises close blockade technology to our country. In a short period of more than two years, has conquered the seaPVDEngineering ship, The seaDCMEngineering ship, land gravel pile machine, landDCMThe equipment manufacture and construction technology of pile machine are difficult.

Plastic drainage board insertion boat

Shanghai Strong foundationThe seaPVDEngineering ship Construction technology for the international initiative, intelligent, efficient and fast construction,1Construction in half minutes12The root30Meters long drainage board, domestic counterparts generally a construction2-4Root, and construction time is longer. Since the commencement of the project, it has been praised by the Hong Kong Airport Authority for many times. The operation of the equipment has been very successful.

Shanghai Qiangqiang Foundation Engineering Co., LTD. 's business covers foundation pit engineering, pile foundation engineering, land and waterFoundation treatment, slope treatment and other engineering fields. around"Excellent technology, reliable process, fast construction" technical requirements, is to provide customers with land, water foundation engineering technical consultation, construction services and other comprehensive solutions of the entity enterprise. Telephone:400-100-2850

contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment