The tool warehouse
Non-standard parts processing workshop
Maintenance and processing shop
Spare parts warehouse
Full hydraulic walking pile driving frame
Hydraulic pile hammer
Planting pile rig
Forward and reverse circulation drill
TRD method machine
Double wheel milling deep mixing drill (CSM)
Multi - axis continuous wall pile drilling machine
Rotating drill
Hong Kong airport is the biggest challenges facing the third runway construction aspect, before the project starts, sea DCM (mixing pile), land DCM (mixing pile), PVD (drain) in the sea, land gravel pile foundation treatment technology such as are for Japan, South Korea, the monopoly of international advanced technology, before and after the tender, the foreign counterparts enterprises of our country executes strict technology blockade. For this reason, the strong foundation has carried on the thorough research. After more than two years of continuous fighting day and night, countless scientific research, testing and adjustment, we have overcome the difficulties of equipment manufacturing and construction technology of PVD (drainage board) engineering ship, DCM (mixing pile) engineering ship, onshore gravel pile machine, and onshore DCM pile machine, and successfully mastered the core technology.