Intelligent pile planting: Shanghai Bailonggang Sewage Treatment Plant
19 Jan

Intelligent pile planting: Shanghai Bailonggang Sewage Treatment Plant

Shanghai Bailonggang Sewage Treatment Plant, located in Chaoyang Village, Heqing Town, Pudong New Area, Shanghai, is an important part of the second phase of Shanghai sewage treatment project.
Adopt intelligent pile planting technology instead of bored pile, eliminate mud discharge, shorten the construction period,Reduce project cost.

Details >
CSM entering moderately weathered strata: Nanjing NO.2014G34 Block CSM Engineering
14 Dec

CSM entering moderately weathered strata: Nanjing NO.2014G34 Block CSM Engineering

Project Name: Nanjing Binjiang Headquarters Base NO.2014G34 Lot CSM Construction method (double-wheel milling soil-cement mixed wall) Project Overview: The excavation depth of the foundation pit is 14.8~16.5m, and the area is about 6600m2. Construction Technology: CSM Construction Date: September 2021

Details >
The application of prestressed fish-belly foundation pit steel support technology in open tunnel engineering is remarkable
16 Aug

The application of prestressed fish-belly foundation pit steel support technology in open tunnel engineering is remarkable

The application effect of prestressed fish-belly type foundation pit steel support technology in open-excavation tunnel engineering is remarkable. The total length of the tunnel is 1244m, the excavation depth of the foundation pit is 3m to 15.4m, and the steel support consumption is about 9000 tons. Prestressed fish-belly foundation pit steel support and undisturbed soil filling concrete pile technology are adopted.

Details >
Strong foundation participated in the construction of TOD complex project of Shaoxing North high-speed Railway Station
14 Aug

Strong foundation participated in the construction of TOD complex project of Shaoxing North high-speed Railway Station

Shaoxing North High-speed Railway Station TOD complex project is the first TOD (transit-oriented development, public transport-oriented development mode) complex project in Shaoxing and a key project in Zhejiang Province. It is located in the front area of Shaoxing North high-speed Railway Station, with a total investment of 6137.25 million yuan.

Details >
Application of new occlusal pile technology in silt soil
07 Jul

Application of new occlusal pile technology in silt soil

The construction technology adopts the bite pile + prestressed fish-belly type foundation pit steel support technology. The excavation area of the foundation pit is 12,584 square meters, the circumference is 614m, and the excavation depth is 9.05m. The project is located in the parcel on the east side of Sunqiao Road and the north of Gaomuqiao Road in Pudong New District, Shanghai.

Details >
Intelligent pile planting + fish-belly steel support: Jinshan New City "01-04" plot project (foundation pit area of 74,500 square meters)
07 Jan

Intelligent pile planting + fish-belly steel support: Jinshan New City "01-04" plot project (foundation pit area of 74,500 square meters)

Jinshan New Town01-04The project is located in Shanyang Town, Jinshan District.
Intelligent piling technology is adopted in pile foundation engineering. Foundation pit engineering adopts the technologies of portal double row pile, bored pile retaining, cement-soil mixing pile gravity dam, three-axis mixing pile water stop, prestressed fish-belly steel support, reinforced concrete support and so on.

Details >
Intelligent pile planting + fish-belly steel support: commercial housing in Jinya Garden
07 Jan

Intelligent pile planting + fish-belly steel support: commercial housing in Jinya Garden

The project foundation pit area of 9,778 square meters; Foundation pit perimeter 397m; Cap area depth & NBSP; 5.95 m . < br/> Intelligent pile planting technology is adopted in pile foundation engineering, and SMW construction pile + prestressed fish-bellies steel support technology is adopted in foundation pit engineering. High-pressure rotary jet grouting pile is used to reinforce local deep pits, and the form of precipitation is light well point precipitation.

Details >
Cast-in-place pile, prestressed fish-belly type foundation pit steel support: Xuzhou Old Material Market project
09 Dec

Cast-in-place pile, prestressed fish-belly type foundation pit steel support: Xuzhou Old Material Market project

The foundation pit circumference of the project is about 570m; The excavation depth of the foundation pit is 9.20-10.50m. The construction technology of pile row + inner support is adopted: bored pile is adopted for pile row; The inner support adopts the prestressed fish-belly foundation pit steel support technology. < br/> Bored pile is adopted for row pile, and prestressed fish-belly foundation pit steel support technology is adopted for inner support.

Details >
Prestressed fish-belly foundation pit steel support: Xuzhou Ruyi Square Phase II project
09 Dec

Prestressed fish-belly foundation pit steel support: Xuzhou Ruyi Square Phase II project

The project covers an area of 80 mu; Foundation pit perimeter 568m; The excavation depth of the foundation pit is 11.1m; The maximum support span is 79.72m; The maximum span of the fish belly beam is 32m. The construction technology uses the prestressed fish-belly type foundation pit steel support technology

Details >
A EPC municipal project | 350000 ㎡ soft foundation treatment, 13 m deep utility tunnel excavation
06 Jul

A EPC municipal project | 350000 ㎡ soft foundation treatment, 13 m deep utility tunnel excavation

This project for the design, procurement and construction (EPC) general contracting project, located in wenzhou economic and technological development zone coastal area to include soft foundation processing (vacuum preloading, the prestressed pipe pile and cement mixing pile, etc.), foundation pit supporting (SMW pile, steel sheet pile, etc.), underground pipe gallery (3.7 km), roads, Bridges, etc., The total cost of the project is about 1.15 billion yuan and the construction period is 1,095 days.

Details >

Contact Us

  • No. 289, Huixian Road, Jiading District, Shanghai
  • 400-100-2850
Business contact
    Mr. Ms.
  • Type of Project:
    Pile foundation engineering Foundation pit engineering Above water foundation treatment Land foundation treatment