Quality management: construction methodically, the process timely acceptance
A solid bamboo joint square pile has been completed, and the project management and supervision personnel have timely monitored and accepted it to ensure the accurate position of the pile. After the completion of each process can be timely acceptance to ensure that the whole project will not deviate from the course. Shanghai Strong Project staff like a well-trained team, in the project construction process can always be orderly, busy without chaos.
Details >Quality management: review pile position, keep improving
In engineering projects, the operator must possess the spirit of "excellence". Otherwise, a miss is as good as a mile. Before construction, technical personnel and supervision should jointly review the pile position coordinates, repeatedly measure to ensure that the error is within the allowed range, and make good marks to check the accuracy of subsequent construction.
Details >Safety management: Engineering operations, safety first
Safety always comes first in engineering operations. In the construction process of a project, many procedures are set up to address safety issues, safety technology disclosure is one of them. Every morning, before the start of the day's work, the project management personnel will first disclose the safety technology to the operators to clarify the safety hazards and precautions in the construction process, so as to reduce the possibility of accidents in the construction process. Such, JOB PERSONNEL ABILITY IS ACCOMPLISHED IN CONSTRUCTION PROCESS ORDERLY, BE prepared FOR TROUBLE.
Details >Quality management: Details determine success or failure
A support is about to be installed, and workers are using pneumatic wrenches to tighten the bolts that support the cover plate. The installation of each support ends with this. "Details determine success or failure", only handle every detail, to ensure construction safety and engineering quality.
Details >Site standard: guardrail - the protection of workers
The operator is carefully installing the guardrail. In the subsequent construction operations, when the operators focus on their work, the guardrail will act as a protective god, providing the most basic guarantee for their safety. In this way, operators can always adhere to the "strong in the stronger, better on the better" spirit of enterprise, dedicated to the construction work.
Details >Site standardization: no small things in the work
The crawler crane driver is carefully operating the crane for lifting operations. In Shanghai Qiangqiang, more than 800 employees work in a variety of jobs. Each job plays a very important role in the development of the company. As two points in Shanghai's strong corporate culture: "not simple" concept, can do simple things every day is "not simple"; The concept of "not easy" means that it is "not easy" to be able to do very conscientiously what is generally acknowledged to be very easy. No matter what position they are in, no matter what job they are dealing with, all employees of Shanghai Strong can be conscientious and conscientious.
Details >Applicability of composite soil nailing wall
Composite soil nail wall is suitable for :(1) water stop curtain. (2) Micro pile. (3) prestressed bolt. (4) composite soil nailing wall should not be used for foundation pit support under the following conditions:
Details >Construction requirements for soil nailing walls
Some of the structural requirements of soil nailwall, mostly in the actual project experience summary, generally have the following provisions:
Details >Introduction of Shanghai Robust Foundation Engineering Co., LTD
Shanghai Qiangqiang Foundation Engineering Co., LTD., a wholly-owned subsidiary of SinoCHEM Rock & Soil, was established in 1998 with a registered capital of 200 million yuan. The qualification level is Grade I for professional contracting of foundation, Grade A for Structural design, Grade B for geotechnical design, Grade III for steel structure construction, Qualification for construction labor service, and qualification for foreign contracting projects. The business covers land and sea foundation treatment, foundation pit engineering, pile foundation engineering, slope treatment and other engineering fields.
Details >More engineering cases in Shandong
Click for more examples of Shanghai Strong Shandong project
Details >Hong Kong airport is the biggest challenges facing the third runway construction aspect, before the project starts, sea DCM (mixing pile), land DCM (mixing pile), PVD (drain) in the sea, land gravel pile foundation treatment technology such as are for Japan, South Korea, the monopoly of international advanced technology, before and after the tender, the foreign counterparts enterprises of our country executes strict technology blockade. For this reason, the strong foundation has carried on the thorough research. After more than two years of continuous fighting day and night, countless scientific research, testing and adjustment, we have overcome the difficulties of equipment manufacturing and construction technology of PVD (drainage board) engineering ship, DCM (mixing pile) engineering ship, onshore gravel pile machine, and onshore DCM pile machine, and successfully mastered the core technology.