Shanghai Qiangjin Engineering Co., Ltd. was established in April 1998 with a registered capital of 200 million yuan. It is a member company of CHINA ZHONGHUA GEOTECHNICAL ENGINEERING GROUP CO.LTD. (stock code: 002542).
The qualification level is the first-level professional foundation contracting, the first-level structural design, the second-level geotechnical design, and the foreign project contracting qualification.
Focusing on professional fields such as foundation pit engineering, pile foundation engineering, water, and land foundation treatment, and slope treatment, it has completed thousands of projects such as housing construction, subway, railway, highway, bridge, tunnel, airport, and land reclamation.
Won the "China Construction Engineering Luban Prize(National Prime-quality Project)" and "Shanghai Construction Engineering MagnoliaAward".
The project is located in Section B4, Area A, Macao New Town. The foundation pit circumference is about 410m, ...
Colombo Port City Development Project is located...
As an international aviation hub in the Asia-Pac...
DCM reinforcement area over water of Hengqin man...
Xifu Intellectual Innovation Center project is l...
The project is located in Section B4, Area A, Maca...
DCM reinforcement area over water of Hengqin mango...
Xifu Intellectual Innovation Center project is loc...
Project Name: Nanjing Binjiang Headquarters Base N...
Jinshan New Town01-04The project is located in Sha...
The project foundation pit area of 9,778 square me...
Compared with the conventional foundation pit supporting technology, this technology can reduce the number of supports and columns, and shorten the construction period compared with the conventional foundation pit supporting technology
The technology ensures the strength, compactance and verticality of the stiffened soil-cement pile, the pile forming speed is fast, and has the advantages of economy and environmental protection
It has the advantages of improving the bearing capacity of foundation, comtrolling the settlement of foundation and reducing the cost of foundation treatment, etc. It is used for land reclamation, soft foundation treatment and highway construction
Obviously reduce the adverse effect of well resistance and smearing effect on drainage consolidation, reduce the blockage of drainage channel, can be saved 20% project cost, shorten35%Time limit for a project
Combining the advantages of rigid pile and flexible pile, it can save 30%-50% the project cost, has the objective economic benefit, the construction speed is fast, the quality is stable and reliable
Strong line 400-100-2850
Hong Kong airport is the biggest challenges facing the third runway construction aspect, before the project starts, sea DCM (mixing pile), land DCM (mixing pile), PVD (drain) in th...
Of steel structure of foundation pit support technology of prestress the stomach, is based on the principle of prestressed, in view of the traditional concrete support, steel suppo...
The project is located in Section B4, Area A, Macao New Town. The foundation pit circumference is about 410m, the area is about 10,698 square meters, and the maximum excavation dep...
The company was established to promote the new technology of static pile (pile foundation engineering).
The company settled in the 15th floor of Jinghong Building, 508 Yishan Road, Shanghai
The environmental protection cement automatic mixing and grouting system has been successfully developed
"High pressure rotary jet reinforced cement soil pile anchor construction method" has been rated as national first-class construction method
Construction of engineering vessels (DCM, PVD) and establishment of Strong International Engineering Limited (domicile: Hong Kong)