Luban Prize Project, hydrostatic PHC pipe pile: Theme Pavilion of Shanghai World Expo
The theme Pavilion of Shanghai World Expo is located in the Shanghai Expo Site. The west exhibition hall of the theme Pavilion spans 180 meters from north to south and 126 meters from east to west, covering an area of 22,268 square meters with a clear height of 14 meters. It is the largest columnless exhibition hall in Asia.
Details >New Hope Project, FDP vacuum preloading: Wenzhou Sanjiang Three-dimensional City
The project is located in Oubei Town, Yongjia County, Wenzhou City. It is a "three-dimensional city" project invested by Wantong Real Estate Co., LTD., New Hope Group Co., LTD.
Details >Intelligent pile planting: Shanghai Bailonggang Sewage Treatment Plant
Shanghai Bailonggang Sewage Treatment Plant, located in Chaoyang Village, Heqing Town, Pudong New Area, Shanghai, is an important part of the second phase of Shanghai sewage treatment project.
Adopt intelligent pile planting technology instead of bored pile, eliminate mud discharge, shorten the construction period,Reduce project cost.
CSM entering moderately weathered strata: Nanjing NO.2014G34 Block CSM Engineering
Project Name: Nanjing Binjiang Headquarters Base NO.2014G34 Lot CSM Construction method (double-wheel milling soil-cement mixed wall) Project Overview: The excavation depth of the foundation pit is 14.8~16.5m, and the area is about 6600m2. Construction Technology: CSM Construction Date: September 2021
Details >The application effect of prestressed fish-belly type foundation pit steel support technology in open-excavation tunnel engineering is remarkable. The total length of the tunnel is 1244m, the excavation depth of the foundation pit is 3m to 15.4m, and the steel support consumption is about 9000 tons. Prestressed fish-belly foundation pit steel support and undisturbed soil filling concrete pile technology are adopted.
Details >Shaoxing North High-speed Railway Station TOD complex project is the first TOD (transit-oriented development, public transport-oriented development mode) complex project in Shaoxing and a key project in Zhejiang Province. It is located in the front area of Shaoxing North high-speed Railway Station, with a total investment of 6137.25 million yuan.
Details >Application of new occlusal pile technology in silt soil
The construction technology adopts the bite pile + prestressed fish-belly type foundation pit steel support technology. The excavation area of the foundation pit is 12,584 square meters, the circumference is 614m, and the excavation depth is 9.05m. The project is located in the parcel on the east side of Sunqiao Road and the north of Gaomuqiao Road in Pudong New District, Shanghai.
Details >Jinshan New Town01-04The project is located in Shanyang Town, Jinshan District.
Intelligent piling technology is adopted in pile foundation engineering. Foundation pit engineering adopts the technologies of portal double row pile, bored pile retaining, cement-soil mixing pile gravity dam, three-axis mixing pile water stop, prestressed fish-belly steel support, reinforced concrete support and so on.
Intelligent pile planting + fish-belly steel support: commercial housing in Jinya Garden
The project foundation pit area of 9,778 square meters; Foundation pit perimeter 397m; Cap area depth & NBSP; 5.95 m . < br/> Intelligent pile planting technology is adopted in pile foundation engineering, and SMW construction pile + prestressed fish-bellies steel support technology is adopted in foundation pit engineering. High-pressure rotary jet grouting pile is used to reinforce local deep pits, and the form of precipitation is light well point precipitation.
Details >Strong foundation explains the advantages of FDP for fast soft foundation treatment
FDPRapid soft foundation treatment technology can obviously reduce the adverse effect of well resistance and smear effect on drainage consolidation, and reduce the blockage of drainage channel,It can eliminate the blind area of the traditional vacuum preloading drainage channel, avoid the dependence on sand resources in the traditional technology, and finally achieve the purpose of reducing the cost and shortening the construction period.
Details >Hong Kong airport is the biggest challenges facing the third runway construction aspect, before the project starts, sea DCM (mixing pile), land DCM (mixing pile), PVD (drain) in the sea, land gravel pile foundation treatment technology such as are for Japan, South Korea, the monopoly of international advanced technology, before and after the tender, the foreign counterparts enterprises of our country executes strict technology blockade. For this reason, the strong foundation has carried on the thorough research. After more than two years of continuous fighting day and night, countless scientific research, testing and adjustment, we have overcome the difficulties of equipment manufacturing and construction technology of PVD (drainage board) engineering ship, DCM (mixing pile) engineering ship, onshore gravel pile machine, and onshore DCM pile machine, and successfully mastered the core technology.